Sunday, July 13, 2008

Material and Methods - Time spent

Saturday 7/12 - 5pm - 1:30pm 5.5 hrs : review summary list, type definitions on blog.

Sunday 7/13 - 7:15pm - 8:15pm 1hr : lookup albedo, review fireplace requirements and type on blog.

Material and Methods - Fireplace

Footing: min. 12" thick; extend 6" min. beyond firebox or chimney masonry.
Fireplace size: 20"dx30"h (typically)
Hearth: min. 4" thick
Back wall: 2" min. firebrick lining & 8" min. solid masonry with lining.
Side walls: 10" min. solid masonry without lining.
Flue damper: 4" min. opening at 8" above top of fireplace opening.
Clearance from combustibles: 2" min. at interior, 4" min. at exterior
Opening clearance: no combustible material within 6" of opening, max 1/8" projection for each 1" away from opening.
Side clearance: Combustible material at side can project 1 1/2"
Chimney termination: above nearest roof surface within 10', or 2' above ridge.

Saturday, July 12, 2008

Material and Methods - Roofing

Materials used to weatherproof the exterior top surface of a structure.

IBC has requirements of fire resistance by occupancy.
Class A = Severe
Class B = Moderate
Class C = Light

Inverted Roof Membrane Assembly (IRMA): A flat roof in which the thermal insulation is placed above the waterproofing membrane. Insulation protects the membrane from the UV radiation, Also eliminates risk of interstitial condensation.

Albedo: Extent to which an object diffusely reflects light from the sun. Defined as the ratio of diffusely reflected to incident electromagnetic radiation.

Friday, July 11, 2008

Material and Methods terms to know

Acoustic controlling trees: coniferous provide better, leaves are denser and thicker than deciduous(broad leafed).

Construction Type: Classification of a building's construction according to the fire resistance of its major components. Limits the area and height of a building according to construction type and intended occupancy.

Critical radiant flux: Amount of radiant energy needed to sustain flame. Test used on flooring. Watts per square centimeter. Two classes, Class I and Class II. Corridors and exitways in Hospitals and Nursing homes must be Class I. Corridors and exitways in commercial and hotels must be Clss II. Only applies to carpet in corridors.

Dead end corridor: Corridor that continues beyond an exit but does not continue to another exit. Maximum distance allowed is 20' per code.

Egress: Consists of three specifically defined parts: exit access, exit and exit discharge.

Fencing materials: most cost efficient - wood or chain link, wood is most common in residential applications, chain link is common in commercial applications.

Fire door: The fire rating classification of the wall into which the door is installed dictates the required fire rating of the door.

Fire door requirements: 4 hr wall = 3 hr door, 2hr wall = 1.5 hr door, 1 hr wall = 1 hr door(occupancy separation), 1 hr wall = .75 hr door(corridor wall), 2 hr wall = 1.5 hr door (exterior wall), 1 hr wall = .75 hr door (exterior wall w/ light fire risk), 1 hr wall = 1/3 hr door(corridor requires smoke and draft control)

Fire Stop(block): A material or member built into a building frame to block a concealed hollow space (or penetration of a rated wall) through which a fire might spread from one part of the building to another.

Means of Egress: A continuous and unobstructed path of travel from any occupied portion of a facility to a public way.

Percolation test: test for determining the rate at which a soil will absorb effluent, made by measuring the rate at which the water level drops after a hole is dug in the soil and filled with water.

Retention pond(basin): Used to manage stormwater runoff, preventing flooding and downstream erosion, improve water quality of adjacent river, stream lake or bay. Provides permenant retension as opposed to a Detention basin which releases collected water at a controlled rate.

Riprap: A layer of broken stones thrown together irregularly on an embankment slope to prevent erosion.

Roofing: Materials and methods used to weatherproof the exterior top surface of a structure.
Sheepsfoot roller: Heavy machinery used to compact soil. looks like a steam roller with knobby looking sheeps feet all over.

Smoke detector: An electronic fire alarm that is activated by the presence of smoke. Governed by NFPA 72. Residential requirements: locate on each floor in each bedroom, each hallway and public space like family room, also in basement and attic.

STC: Sound Transmission Class - Number rating of the performance of a building material or construction assembly in preventing the transmission of airborne sound.

Toilet partition: A panel forming an enclosure around a water closet for privacy in a public lavatory. Cost in order of most to least expensive: Floor to ceiling, Ceiling hung, Floor mounted & overhead braced.

Water table: Underground surface beneath which the earth is saturated with water.

Well points: Used to dewater a site. Perforated tube driven into the ground to collect water from the surrounding area so it can be pumped away in order to lower a water table or prevent an excavation from filling with groundwater.

Moved Test Date (again)

Mat and Meth now set for 7/18. study has been lax. started back up the other day.

Monday 7/9/08 - read summary material for 1.25 hours.