Second pass at Alt 4.
Tuesday, March 05, 2013
Monday, March 04, 2013
Schematic Design Building Layout Sajjad Alt III
Room names aren't right, the file wasn't right so I used substitute rooms. Sajjad Alt III
Program pasted below.
Program pasted below.
From Ironwarriors
ftp
http://www.ironwarrior.org/ARE/Building_Planning/Alt_Vignettes/Alt%20SD%20Files/
Alt
III Program
The community library
will house general and special collections.
Meeting areas for the public will also be available.
1. The site is located adjacent to and to the
south of a decorative arts museum.
Parking is provided off the site.
2. The major view is to the South.
3. The lending desk/office is to have visual
control of the entry to each of the following spaces: the lobby, the workroom,
and the children’s reading room.
4. The main entrance door shall face New York
Avenue.
5. All spaces shall have a 9 ft ceiling height
except the main reading room, which shall have an 18 ft ceiling height.
6. The area of each space shall be within 10% of
the required program area.
7. The total corridor area shall not exceed 25%
of the total program area.
8. The second floor envelope must be congruent
with or wholly contained within the first floor envelope with the exception
that doors to the exterior may be recessed for weather protection.
Program
- Spaces
Tag Name Area (ft²) Requirements
ST Stair 800 2 per floor @ 200 ft² per stair
E Elevator Shaft 200 1 per floor @ 100 ft² each
Minimum dimension = 7
ft
EE Elevator Equipment Room 100
EM Electrical/Mechanical Room 500
L Lobby 350 Main Entrance
LD Lending Desk/Office 200
MR Main Reading Room 2,500 View--exterior window
required
18 ft ceiling
2 exits
First floor
T Toilet Rooms 600 2 per floor @ 150 ft² each
W Workroom 400 Exterior windows prohibited
Direct access to
Lending Desk/Office
S Stacks 1,000 Exterior windows prohibited
Direct access to Main
Reading Room
LM Large Meeting Room 750 Exterior window
required
Second floor
SM Small Meeting Room 350 Exterior window
required
Near Large Meeting
Room
CR Children's Reading Room 500 View--exterior window
required
Near Main Reading
Room
HO Head Librarian's Office 200 Exterior window
required
Direct access to
Secretarial Office
AO Assistant Librarian's Office 150 Exterior window
required
Direct access to
Secretarial Office
SO Secretarial Office 300 Exterior window
required
Near Large Meeting
Room
SC Special Collections 500 First floor
Exterior window
required
B Break Room 300 Near Large Meeting Room
C Custodial 200 2 @ 100 ft²
TOTAL PROGRAM AREA 9,900 ft²
Sunday, March 03, 2013
Saturday, March 02, 2013
Subscribe to:
Posts (Atom)