Thursday, January 09, 2014
Tuesday, May 07, 2013
Structural Systems Vignette - Custom Alternate
Found this on the areforum.org ftp site under the building technology folder.
Posted for peer review on forum @ http://www.areforum.org/forums/showthread.php?307037-Custom-Alternate-Testing-Thursday&p=1444469#post1444469
Lower level
Posted for peer review on forum @ http://www.areforum.org/forums/showthread.php?307037-Custom-Alternate-Testing-Thursday&p=1444469#post1444469
Lower level
Upper Level
Sunday, May 05, 2013
Tuesday, March 05, 2013
Monday, March 04, 2013
Schematic Design Building Layout Sajjad Alt III
Room names aren't right, the file wasn't right so I used substitute rooms. Sajjad Alt III
Program pasted below.
Program pasted below.
From Ironwarriors
ftp
http://www.ironwarrior.org/ARE/Building_Planning/Alt_Vignettes/Alt%20SD%20Files/
Alt
III Program
The community library
will house general and special collections.
Meeting areas for the public will also be available.
1. The site is located adjacent to and to the
south of a decorative arts museum.
Parking is provided off the site.
2. The major view is to the South.
3. The lending desk/office is to have visual
control of the entry to each of the following spaces: the lobby, the workroom,
and the children’s reading room.
4. The main entrance door shall face New York
Avenue.
5. All spaces shall have a 9 ft ceiling height
except the main reading room, which shall have an 18 ft ceiling height.
6. The area of each space shall be within 10% of
the required program area.
7. The total corridor area shall not exceed 25%
of the total program area.
8. The second floor envelope must be congruent
with or wholly contained within the first floor envelope with the exception
that doors to the exterior may be recessed for weather protection.
Program
- Spaces
Tag Name Area (ft²) Requirements
ST Stair 800 2 per floor @ 200 ft² per stair
E Elevator Shaft 200 1 per floor @ 100 ft² each
Minimum dimension = 7
ft
EE Elevator Equipment Room 100
EM Electrical/Mechanical Room 500
L Lobby 350 Main Entrance
LD Lending Desk/Office 200
MR Main Reading Room 2,500 View--exterior window
required
18 ft ceiling
2 exits
First floor
T Toilet Rooms 600 2 per floor @ 150 ft² each
W Workroom 400 Exterior windows prohibited
Direct access to
Lending Desk/Office
S Stacks 1,000 Exterior windows prohibited
Direct access to Main
Reading Room
LM Large Meeting Room 750 Exterior window
required
Second floor
SM Small Meeting Room 350 Exterior window
required
Near Large Meeting
Room
CR Children's Reading Room 500 View--exterior window
required
Near Main Reading
Room
HO Head Librarian's Office 200 Exterior window
required
Direct access to
Secretarial Office
AO Assistant Librarian's Office 150 Exterior window
required
Direct access to
Secretarial Office
SO Secretarial Office 300 Exterior window
required
Near Large Meeting
Room
SC Special Collections 500 First floor
Exterior window
required
B Break Room 300 Near Large Meeting Room
C Custodial 200 2 @ 100 ft²
TOTAL PROGRAM AREA 9,900 ft²
Sunday, March 03, 2013
Saturday, March 02, 2013
Thursday, February 28, 2013
Wednesday, February 27, 2013
Monday, February 25, 2013
Schematic Design: NCARB Building Layout
Update: See the following link for review comments: http://www.areforum.org/forums/showthread.php?301617-BL-first-timer-please-comment-thanks!
First pass at building layout practice exam. NCARB original program.
took 5 hours total to complete. I will be working on this one. Scheduled to take this March 7th, 1.5 weeks from now.
FIRST FLOOR
SECOND FLOOR
First pass at building layout practice exam. NCARB original program.
took 5 hours total to complete. I will be working on this one. Scheduled to take this March 7th, 1.5 weeks from now.
FIRST FLOOR
SECOND FLOOR
Saturday, February 23, 2013
Schematic Design - Interior Layout (NCARB)
Sunday, January 20, 2013
Sunday, November 18, 2012
SPD - Sun Chart
ref: http://www.new-learn.info/packages/clear/thermal/climate/sun/sunpath_diagrams.html
Earth rotates about on a fixed plane that is tilted 23.5°
Averaged, the Earth will complete one rotation every 24hrs (based on a solar day) and thus moves at a rate of 15° per hour (one full rotation is 360°).
For northern hemisphere, the shortest solar day occurs around December 21 (winter solstice) and the longest solar day occurs around June 21 (summer solstice).
time the earth takes to move around the sun is approximately 365 days. This path that the earth takes to revolve around the sun is called the elliptical path.
The angle between the earth- sun line and the earth"s equatorial plane is known as the angle of declination.
Searched for "sun path diagrams" and came up with this great site:
http://wiki.naturalfrequency.com/wiki/Solar_Position
Look in the back of the MEEB book (Mechanical and Electrical Equipment for Buildings)
Saturday, October 27, 2012
ARE Exam Study Links
http://www.dustingoffron.com/ARE/
This is a page I found on the ARE Forum that I thought is worth sharing. It contains links to information and study material relating to each exam. It looks to be very useful and comes highly recommended from other forum users. Enjoy!
This is a page I found on the ARE Forum that I thought is worth sharing. It contains links to information and study material relating to each exam. It looks to be very useful and comes highly recommended from other forum users. Enjoy!
Site Planning Exam Scheduled
I finally set a date for this exam. I submitted time off from my job to take the exam on December 4, so now I have to get moving.
Site Planning Book Update
I am about halfway through the book, Site Planning 3rd Ed by Lynch and Hack. I have only documented a summary on Chpt 1 though. I have been reading it off and on for two years now. I am going to continue reading more often now that I have set my Site Planning Exam date for one Month from now. I look forward to posting more summaries as this is how I seem to best retain information.
Thursday, September 13, 2012
ARE Exam Practice Software
The practice software does not install on an x64 operation system (Windows 7).
This post I found is the clearest instruction on how to handle that:
http://blog.arefaq.com/?p=137
This post I found is the clearest instruction on how to handle that:
http://blog.arefaq.com/?p=137
Wednesday, April 25, 2012
New Exam Timeline
Just realized I only have one year to complete four exams until the 5 year rolling clock takes away my first one I took in May of 2008.
Tentative exam order:
Site Planning and Design
Schematic Design
Programming Planning and Practice
Structural Systems
Started study for SPD yesterday. Downloaded the NCARB study guide and started reading the book I was partway through already, "Site Planning" 3rd Ed. by Kevin Lynch and Gary Hack. I will be posting notes from this book eventually.
Monday, November 01, 2010
Take Two Exams In Same Week
Here is a screenshot of the ARE 4.0 guideline page showing exam times.I'm thinking about taking SPD (Site Planning and Design) and PPP (Programming, Planning & Practice) in the same week. Each test is too long to take in the same day I believe. It Might have to be an overnighter. I am in San Luis Obispo, CA. The nearest Prometric test center is in Camarillo just outside of Oxnard. It's a 2.5 hour drive for me one way. We'll have to see how that works out. I'm used to it being 4 blocks away when I lived in SF.
Wednesday, August 18, 2010
Site Planning Book
I finally received and started reading this book, Site Planning 3rd Ed., by Kevin Lynch. It is recommended as a great introduction to site planning as well as one of the main source materials for the ARE Site Planning and Design exam. I will attempt to post brief highlights as I read through.
Subscribe to:
Posts (Atom)















