(Note: This is MY summary of the notes notes from the Norman Dorf ARE Graphic Workshop, for complete notes, visit the areforum.com ftp site.)
Building Technology Division
General
- Don't tweak your designs if you have extra time - you will run out of time, most likely in the middle of tweaking.
- computer does not grade on quality of design, only check against code/program data
Building section
- Read plan with all layers on
- Draw section over plan right below cut line.
- Draw grade first
- Draw slab on TOP of grade
- Slab is discontinuous between bearing/stem walls
- Draw footings (check frost depth requirement)
- perimeter footings: stem wall starts at top of slab, top of footing aligns with frost depth
- frost depth: measure from grade line, not top of slab
- interior footings: be sure to place at any bearing walls as indicated.
- Stem breaks slab
- Top of footing aligns with bottom of slab & grade line, unless program states otherwise
- Ceilings: Draw sketch lines/rectangles for required ceiling height first
- Draw ceiling line
- Draw lighting clearance sketch rectangle (usually 8" but read program)
- Duct / joist size: Look for largest joist/duct COMBINATION that share common ceiling area in entire floor area.
- Click here for detailed description see comment posted on Sun Mar 15th by Sinkwcal
- Draw sketch rectangles again for duct(even though that size duct may not show up in the actual section) and joist
- Draw joists: check size being cut through and direction
- be sure to move to align with layout on plan
- overlap halfway into bearing walls
- Draw ducts being cut: put right under joist
- Non-rated & Non bearing wall Partitions: stop 6" above ceiling line & cut ceiling
- Rated wall partitions: cut ceiling line and stops underside of floor/roof deck above
- For 2nd floor and high ceiling spaces, repeat ceilings and duct/joist size above
- Don't forget parapets, see program for required height
Common Fatal Errors
- Missing Program requirements: Read thoroughly and write a checklist, also, check it off as you go or at end(when you think you are finished)
- Missing elements: Ducts, Partitions, Interior Footings, Parapets (see checklist)
-Joists spanning in wrong direction
- improper dimensioning: check and re-check floor & roof heights
- Technical errors:
- Footing depths
- Rated partitions & their height
- Joists NOT supported on walls, Carry into wall 4-6 inches
No comments:
Post a Comment